Your Project Scope & Investment

Prepared for

Jacklyn French
Project Type Tub-to-Shower Conversion
Prepared March 26, 2026
Valid Through April 25, 2026

This document outlines the full scope, material selections, and estimated investment for your wet-space project at 2400 Longmire Dr., College Station. Every detail below reflects the choices made during your evaluation — nothing has been assumed or added without your input.

Your Shower System

A complete tub-to-shower conversion — removing the existing bathtub and replacing it with a fully waterproof, solid surface walk-in shower system.

Confirmed Selections
Shower Base
Custom solid surface base — White, 60" × 30", fabricated to your exact dimensions
Included
Wall System
MNHS Waterproof Wall System — Foundation Collection, White Subway Tile pattern (6 surfaces)
Included
Shower Door
3/8" frameless glass — Inline + Pivot Door, custom-fabricated to your opening
Upgrade
Door Hardware
Matte Black finish — hinges, brackets, and all glass hardware
Upgrade
Showerhead
Fixed Shower Head with valve and trim kit — Matte Black finish to match your hardware
Included
Built-In Wall Niches (×2)
Two 14" × 14" recessed niches — Matte Black (Classic Powder Coat finish)
Upgrade
Corner Footrest
9" × 9" solid surface corner footrest — Black
Add-On
Project Scope — What We Handle
  • Complete removal of existing cast iron bathtub + haul-away from 2nd floor
  • Full demolition and disposal of existing tile surround
  • New plumbing lines — valve, supply lines, shower drain, and trap
  • Tub-to-shower drain conversion
  • Custom solid surface shower base, precision-fitted and level-set
  • MNHS Waterproof Wall System installed floor-to-ceiling — no grout, no tile
  • 3/8" frameless glass enclosure, professionally measured and installed
  • Fixed shower head, valve, and trim kit installed to finish
  • Two built-in wall niches and corner footrest installed
  • Subfloor inspection and replacement beneath tub footprint
  • Full jobsite protection, cleanup, and debris removal
Your Estimated Investment

Tub-to-Shower Conversion — 60" × 30"

$14,694
Complete tub-to-shower conversion — all materials, labor, and installation included.

About this investment: This figure reflects the specific selections and scope outlined in this document. It includes all materials, labor, installation, and project management. The final investment is confirmed in your project agreement before any work begins.

What drives investment in a wet-space project? The three largest factors in your system are the shower base (custom-fabricated solid surface), the wall system (engineered waterproof surfaces precision-fitted to your dimensions), and the glass enclosure (3/8" frameless, custom-cut). Your choice of Matte Black hardware and the Inline + Pivot door style are upgrades that contribute to the total. The cast iron tub removal, 2nd-floor haul-away, and subfloor replacement add scope-specific labor that would not apply to a standard shower replacement.

Your Selections

Every material and finish listed below was selected during your evaluation. These selections are reserved for your project.

Wall System
Collection
Foundation Collection — MNHS Waterproof Wall System
Pattern
White Subway Tile — clean, linear surface pattern with a modern profile
Coverage
6 wall surfaces, floor-to-ceiling — fully waterproof, no grout, lifetime warranty
Shower Door & Glass
Style
Inline + Pivot Door — inline glass panel with a hinged pivot door for full enclosure
Glass
3/8" frameless tempered glass, custom-fabricated to your 60" opening
Hardware Finish
Matte Black — all hinges, brackets, handles, and mounting hardware
Fixture & Accessories
Showerhead
Fixed Shower Head — 8-function wall-mounted head, Matte Black finish, with dedicated valve and trim kit
Wall Niches (×2)
Two 14" × 14" built-in recessed niches — Matte Black (Classic Powder Coat finish)
Corner Footrest
9" × 9" solid surface corner footrest — Black finish
Base & Conversion Scope
Shower Base
Custom solid surface base — White, 60" × 30", low-profile modern threshold
Tub Removal
Cast iron bathtub removal + haul-away and disposal from 2nd floor
Plumbing
Full conversion from tub configuration to shower — new valve, supply lines, drain, and trap
Subfloor Replacement
Inspection and replacement of subfloor beneath tub footprint, if needed upon demolition — included at no additional charge

What Happens Next

Your project follows a structured sequence designed so you always know what's happening and what comes next.

Evaluation Complete
Your project scope, material selections, and estimated investment have been reviewed and documented. You're looking at it now.
2
Review & Approve
Review the scope and investment outlined in this document. When you're ready to move forward, we'll send a project agreement and schedule your installation window.
3
Materials Ordered
Once your agreement is signed, all materials are ordered and manufactured to your exact specifications. Lead time is typically 2–3 weeks depending on availability.
4
Installation Day
Our installation team arrives with everything pre-staged. Typical tub-to-shower conversions complete in 1–2 days. Your bathroom is fully functional the day we finish.
5
Completion Walkthrough
We walk through the finished project together, confirm every detail meets your expectations, and hand over all warranty documentation.

Ready to move forward?

Reply to the email that delivered this page, or contact Cameron directly. We'll send over the project agreement and get your materials ordered.

Contact Cameron